Technician Makes Final On-Site Adjustments
Cabinet Being Prepared for Rack Installation

Installation begins with wall plates, speakers, and other “field” components. These are wired so that they are ready to be connected when the main system components arrive on the job site. Once all system components have been delivered to the job site, a technician connects the field components.

At this point, the technician will conduct preliminary quality control. The basic functions of the system will be run through and all field components will be tested. Since the system has already been set up and tested in our workshop, the technician knows that issues discovered at this quality control checkpoint are likely to be in field cabling or field components which allows them to diagnose issues efficiently.

After installation, Quality Control...